Our company’s energy modeling services assist variety of customers to achieve their targeted LEED points based on energy savings beyond baseline ASHRAE 90.1 and exhibit code compliance required by local and federal government’s energy standard.
University of Maryland Capital Region Medical Center
The UMCRMC building is a 750,000 SF (69,677 SQ.M.) hospital building composed with inpatient, outpatient, triage, cafeteria, and operational center.
Pandagy is hired to perform energy analyses on several building systems to identify the most energy efficient lighting, HVAC, and equipment. In addition, Pandagy also performed the energy modeling for LEED certification which assists the project to achieve the LEED Silver Level.
The building utilizes high-efficient HVAC systems including water-cooled chiller, condensing gas boilers, and combined heat power equipment.
The recommended systems result in operational cost savings of $1,681,825 over the baseline design.
Achieved 14 points in Optimized Energy Performance Credits.
Assist the building owner to acquire $2 Million Dollars BGE Incentive for Combined Heat & Power System
MedImmune, Inc. Administration and Research & Development Campus
The MedImmune campus is a 887,590 SF (82,459 SQ.M.) office and laboratory building (six connected buildings) located in Gaithersburg, MD.
Pandagy is hired to perform an energy model and payback analyses on the entire campus building to compare multiple HVAC controls upgrades on both air-side and water-side systems including Airside economizer reset, static pressure reset, chilled water supply temperature reset.
The building utilizes high-efficient HVAC systems including water-cooled chiller, condensing gas boilers, and high-efficient air-handlers.
The energy analysis results assisted the building owner in the decision-making process to pursue the re-size of the HVAC systems due to the changes in the occupancy in the building over the years.
The ARC West
The ARC West building is a 110,000 SF (10,219 SQ.M.) state of the art community center composed with a theatre, classrooms, offices, and common areas. The ARC serves more than 85,000 people annually provide programs and services such as dance classes, music, fine arts, academics, continuation education, and more.
Pandagy performed an energy analysis on the building system design including lighting and HVAC systems to identify the most optimal energy efficient systems.
The recommended system saved 32% of operational cost savings over baseline design.
Because of the creative design of the project and design team, this project was awarded for USGBC (U.S. Green Building Council National Capital) Region’s 2019 Innovative Project of the Year, New Construction – Commercial.
Laurel Medical Center
The Laurel Medical Center building is a 71,000 SF (69,677 SQ.M.) hospital building composed with inpatient, outpatient, operating rooms, patient rooms, offices, and common areas.
Pandagy was contracted to perform energy analyses on the building systems including lighting and HVAC systems to identify the most optimal energy efficient systems.
The recommended system saved 12% of operational cost savings over baseline design.
McCormick Headquarter
360,000 SF office building with commercial kitchen facility and solar technology
Solar panels design assisted in 15% of the electric energy savings.
Achieved 16 points in Optimized Energy Performance Credits for LEED certification.
Acquired $136,618 utility incentive from BG&E.
United States Institute of Peace
2 connected 36,000 SF office buildings with variable-refrigerant-volume (VRV) system.
Achieved 19 points in Optimized Energy Performance Credits for LEED certification.
The Lumen (Tyson Central Building F)
666,971 SF 32-story multifamily building with 398 dwelling units, 17,000 sf of retail, 500 car parking garages
Achieved 9 points in Optimized Energy Performance Credits for LEED certification.